Electrical Downtime Cost Calculator — ConnectivityColin.com
Electrical Downtime Cost Calculator
Quantify the true cost of terminal block failures, intermittent connector faults, and cable damage on your packaging lines — including MTTR search time.
Number of packaging lines
lines
Production shifts per day
shifts
Production days per year
days
Production value per hour (per line)
$ /hr
Fully loaded maintenance labour rate
$ /hr
Technicians deployed per fault event
techs
■ Cause 1 — Loose or Failed Terminal Block Connections
Fault events per line per year
events
Avg. total downtime per event
hrs
% of total downtime spent searching (MTTR search vs repair split)
%
Search time
Repair time
■ Cause 2 — Bad Field Connectors & Intermittent Faults
Fault events per line per year
events
Avg. total downtime per event
hrs
% of total downtime spent searching (intermittent faults are hardest to find)
%
Search time
Repair time
■ Cause 3 — Wrong or Damaged Cables (Cable Tracks & Robotic Applications)
Fault events per line per year
events
Avg. total downtime per event
hrs
% of total downtime spent searching (wrong cable spec is often not obvious)
%
Search time
Repair time
Scroll to Top