Free Resources

The Right Resources for Your World

The challenges facing a packaging machine builder are different from those facing a CPG plant manager. Tell us which world you operate in and we will take you straight to the resources that are most relevant to you.

Choose Your Path

Who Are You?

Both paths include free downloads, articles, and tools. The calculators and some white papers are tailored to your specific challenges.

Machine Builder

Packaging OEM

You design and build packaging machinery. Your challenges are build time, wiring complexity, skilled labour shortages, commissioning delays, and the cost of rework.  These resources are built around your world.
  • OEM Field Connector Rework Cost Calculator
  • Machine Startup Time Reduction Guide
  • IP20 vs IP67 Architecture Cost Calculator
  • The Control System Complexity Scorecard
Manufacturer / End User

CPG Manufacturer

You run packaging lines for food, beverage, personal care, or consumer goods. Your challenges are unplanned downtime, reducing MTTR, retaining skilled labour, and the true cost of your current electrical architecture.
  • CPG Field Connector Downtime Cost Calculator
  • IP20 vs IP67 True Cost Calculator
  • Intermittent Fault Diagnostic Checklist
  • The 25 Connectivity Failure Points Checklist

Not Sure Which Applies to You?

Some engineers wear both hats. If you design machines and run a production floor, start with the OEM path. Or just book a free Connectivity Chat and we will work out together what is most useful for your situation.

Scroll to Top